Joggers & sweatpants manufacturing in Bangladesh
Cuffed joggers, open-hem sweatpants and tech joggers from 300 pieces per colour — sampled, inspected at AQL 2.5 and shipped.

- MOQ
- 300
- pcs / style / colour
- SAMPLE
- 10–14d
- proto on stock fabric
- BULK
- 45–60d
- after PP approval
- PRICE BAND
- Publishing
- goes live with 3+ factory quotes
- FABRICS
- 220–320
- GSM · fleece, terry, tech knit
The minimum order for joggers and sweatpants in Bangladesh is typically 300 pieces per style and colour on stock fabric, and 1,000 or more for custom-dyed or custom-made fabric. Allow 10–14 days for a proto sample and 45–60 days of production after pre-production approval; sea freight is extra. These are indicative ranges, confirmed in your costing.
Styles we make
Cuffed jogger
280–320 GSMOpen-hem sweatpant
300 GSMTech jogger
260 GSM polyCargo jogger
320 GSMKids jogger
240 GSMLounge pant
220 GSM
Illustrated studies, not product photos. Real sample photography is added as programmes ship.
Fabrics & specifications
| FABRIC | GSM / SPEC | COMPOSITIONS | FINISHES |
|---|---|---|---|
| Brushed fleece | 280–320 | Cotton/poly, brushed back | Anti-pill |
| French terry | 240–300 | Cotton, cotton/poly | Enzyme, light brushing |
| Tech knit | 200–260 | Polyester, recycled polyester (GRS) | Wicking or smooth hand |
| Cotton jersey (lounge) | 180–220 | 100% cotton, organic | Enzyme, silicone |
Decoration and details: Embroidery · Screen print · Rubber or silicone print · Drawcords and eyelets · Zip pockets · Woven and printed labels
MOQ & lead time
| Order size | Sample | Bulk |
|---|---|---|
| 300 pcs · stock fabric | 10–14d | 35–45d |
| 1,000 pcs · custom-dyed | 14–18d | 45–60d |
| 3,000+ pcs · custom-knit | 18–21d | 55–70d |
Indicative ranges in calendar days, confirmed in your costing. Bulk time runs from pre-production sample approval.
Work out your latest order date →Price guide
Price bands publishing January 2027
We only publish a band once three written factory quotes back it. Until then: the method, the price drivers and one T-shirt costed line by line.
What moves the price
- Fabric weight and type
- Composition
- Pocket and zip construction
- Waistband and drawcord trims
- Wash or finish
- Size range
- Order size
Customisation
- Woven & printed labels
- Screen print · DTF
- Embroidery
- Garment dye & washes
- Hangtags & stickers
- Polybags & cartons
Compliance
- OEKO-TEX Standard 100Tested for harmful substancesAVAILABLE
- GRSRecycled content with chain of custodyAVAILABLE
- WRAPSocial compliance, factory levelAVAILABLE
- amfori BSCISocial audit, factory levelAVAILABLE
- Sedex SMETASocial and ethical audit, factory levelAVAILABLE
Certificates belong to factories and mills, not to Giga Sourcing. Which scheme applies depends on the factory selected for your programme; live certificates are shared per programme after factory selection.
Process & timeline
- Brief & costing — Week 1
- Sampling — Weeks 2–4
- Fabric & trims — Weeks 5–7
- Production + QC — Weeks 7–12
- Shipping — Weeks 13–17
Typical first order. Fabric and trims booking overlaps the start of production; shipping time depends on the destination.
Joggers & sweatpants — FAQ
What is the minimum order quantity for joggers and sweatpants?
300 pieces per style per colour on stock fabric; 1,000+ for custom-dyed or custom-made fabric. Mills dye in lots of roughly 1,000 metres, which is why custom colours need higher quantities.
How much does a pair of joggers cost to make in Bangladesh?
We publish an indicative FOB band for joggers and sweatpants only once at least three written factory quotes support it. Until then the price guide shows the method and the main price drivers (fabric weight and type, composition and pocket and zip construction), and your costing estimate is built line by line from factory quotes.
Can you add zip pockets, cargo pockets and ankle zips?
Yes. Pocket and closure details are standard options; each adds sewing time and trims, so they show as separate lines in your costing.
Which waistband options are available?
Elasticated waistbands with internal or external drawcords, flat-knit rib and covered elastic are common builds. Tell us the reference garment and we match it.
Do you handle labels and packaging?
Yes. Woven labels, hangtags, polybags and cartons are sourced and attached in the factory.
How do you check quality?
Inline checks during sewing and a third-party final inspection at AQL 2.5 before you pay the balance.
How long does sampling take?
Typically 10–14 days for a proto on stock fabric, plus courier time. Fit and PP samples follow in 1–2 week cycles.
Can I visit the factory?
Yes, in person or by video walk-through, arranged once your programme is confirmed.
- PRICING GUIDEPrice bands, method and worked example for joggers and sweatpants
- GUIDE · COST & DUTYWhat does it cost to make T-shirts in Bangladesh in 2026?
- GUIDE · PRODUCT & FABRICProduct & fabric: choosing weights, compositions and finishes
- TOOLLanded-cost calculator — FOB, freight and duty to your door
- MARKETSourcing apparel from Bangladesh to the United States
Start a joggers and sweatpants request
Step 1 is pre-filled with joggers and sweatpants. Reply within one business day.