Trims & packaging manufacturing in Bangladesh
Woven labels, hangtags, polybags and cartons sourced with your garment programme, so brand details arrive at the factory in time for packing.

- MOQ
- 1,000
- pcs / style / colour
- SAMPLE
- 7–10d
- proto on stock fabric
- BULK
- 15–25d
- after PP approval
- PRICE BAND
- Publishing
- goes live with 3+ factory quotes
- MATERIALS
- Labels to cartons
- damask, 350–450 gsm board, 5-ply
Trims and packaging are normally sourced as part of a garment programme: woven labels, hangtags, polybags and cartons are made to your artwork and attached or packed in the factory. The minimum is typically 1,000 pieces per design, and bulk production usually takes 15–25 days. These are indicative ranges, confirmed in your costing.
What we source
Woven labels
damaskHangtags
400 gsm boardPolybags
recycled LDPECartons
5-plyPrinted tapes
satinStickers
size + barcode
Illustrated studies, not product photos. Real sample photography is added as programmes ship.
Fabrics & specifications
| FABRIC | GSM / SPEC | COMPOSITIONS | FINISHES |
|---|---|---|---|
| Woven label | damask / satin | Polyester | Heat-cut |
| Hangtag | 350–450 gsm | FSC board | Matt laminate |
| Polybag | 40–60 µm | Recycled LDPE | Suffocation warning |
| Carton | 5-ply | Corrugated board | Printed in one or two colours |
Decoration and details: Custom artwork and Pantone-matched colours · Barcode and size stickers · Printed care and size labels · Suffocation warnings on polybags · Printed cartons
MOQ & lead time
| Order size | Sample | Bulk |
|---|---|---|
| Stock sizes · one-colour print | 7–10d | 15–20d |
| Custom artwork · multi-colour | 10–14d | 20–25d |
Indicative ranges in calendar days, confirmed in your costing. Bulk time runs from pre-production sample approval.
Work out your latest order date →Price guide
Price bands publishing January 2027
We only publish a band once three written factory quotes back it. Until then: the method, the price drivers and one T-shirt costed line by line.
What moves the price
- Material and thickness
- Number of colours
- Artwork complexity
- Size and structure
- Finishing (lamination, heat-cut)
- Order size per design
Customisation
- Woven & printed labels
- Hangtags & stickers
- Polybags & cartons
- Barcode and size stickers
- Printed tapes
- Warnings and care labels
Compliance
- OEKO-TEX Standard 100Tested for harmful substancesAVAILABLE
- GRSRecycled content with chain of custodyAVAILABLE
Certificates belong to factories and mills, not to Giga Sourcing. Which scheme applies depends on the factory selected for your programme; live certificates are shared per programme after factory selection.
Process & timeline
- Brief & costing — Week 1
- Sampling — Weeks 2–3
- Fabric & trims — Week 4
- Production + QC — Weeks 4–6
- Shipping — Weeks 7–11
Typical first order. Fabric and trims booking overlaps the start of production; shipping time depends on the destination.
Trims & packaging — FAQ
What is the minimum order quantity for trims and packaging?
1,000 pieces per style per colour. Mills dye and knit in large lots, so the floor is set by the fabric, not the sewing line; your costing confirms it for your spec.
How much does a trim set cost to make in Bangladesh?
We publish an indicative FOB band for trims and packaging only once at least three written factory quotes support it. Until then the price guide shows the method and the main price drivers (material and thickness, number of colours and artwork complexity), and your costing estimate is built line by line from factory quotes.
Can I order trims and packaging on their own?
Trims are normally sourced as part of a garment programme so they match the order. If you need them separately, say so in your request and we confirm what is possible.
Can labels and hangtags be made from recycled or certified materials?
Recycled LDPE polybags and certified-board hangtags are options; availability depends on the supplier, so we confirm certificates per programme.
Do you handle labels and packaging?
Yes. Woven labels, hangtags, polybags and cartons are sourced and attached in the factory.
How do you check quality?
Inline checks during sewing and a third-party final inspection at AQL 2.5 before you pay the balance.
How long does sampling take?
Typically 7–10 days for a proto on stock fabric, plus courier time. Fit and PP samples follow in 1–2 week cycles.
Can I visit the factory?
Yes, in person or by video walk-through, arranged once your programme is confirmed.
- PRICING GUIDEPrice bands, method and worked example for trims and packaging
- GUIDE · SOURCINGHow to source clothing from Bangladesh: a step-by-step guide for brands
- GUIDE · PRODUCT & FABRICProduct & fabric: choosing weights, compositions and finishes
- TOOLLanded-cost calculator — FOB, freight and duty to your door
- MARKETSourcing apparel from Bangladesh to Germany
Start a trims and packaging request
Step 1 is pre-filled with trims and packaging. Reply within one business day.