Trousers & chinos manufacturing in Bangladesh
Chinos, cargo trousers and tailored trousers in twill and canvas from 800 pieces per colour — washed, inspected and shipped.

- MOQ
- 800
- pcs / style / colour
- SAMPLE
- 10–14d
- proto on stock fabric
- BULK
- 45–60d
- after PP approval
- PRICE BAND
- Publishing
- goes live with 3+ factory quotes
- FABRICS
- 150–340
- GSM · twill, stretch twill, canvas
The minimum order for trousers and chinos in Bangladesh is typically 800 pieces per style and colour on stock fabric, and 1,000 or more for custom-dyed or custom-made fabric. Allow 10–14 days for a proto sample and 45–60 days of production after pre-production approval; sea freight is extra. These are indicative ranges, confirmed in your costing.
Styles we make
Chino (slim or straight)
220–260 GSMPleated trouser
200–240 GSMCargo trouser
260–320 GSMPull-on, elastic waist
180–240 GSMUtility pant
280–340 GSMUniform trouser
240–300 GSM
Illustrated studies, not product photos. Real sample photography is added as programmes ship.
Fabrics & specifications
| FABRIC | GSM / SPEC | COMPOSITIONS | FINISHES |
|---|---|---|---|
| Twill / chino | 220–280 | Cotton, stretch | Peach, enzyme |
| Stretch twill | 240–280 | Cotton/elastane | Garment dye |
| Canvas | 280–340 | 100% cotton | Pre-shrunk |
| Linen blend | 150–200 | Linen-cotton | Stone wash |
Decoration and details: Embroidery · Woven and printed labels · Custom buttons and zips · Garment dye · Enzyme or peach finishing
MOQ & lead time
| Order size | Sample | Bulk |
|---|---|---|
| 800 pcs · stock fabric | 10–14d | 35–45d |
| 1,000 pcs · custom-dyed | 14–18d | 45–60d |
| 3,000+ pcs · custom-woven | 18–21d | 55–70d |
Indicative ranges in calendar days, confirmed in your costing. Bulk time runs from pre-production sample approval.
Work out your latest order date →Price guide
Price bands publishing January 2027
We only publish a band once three written factory quotes back it. Until then: the method, the price drivers and one T-shirt costed line by line.
What moves the price
- Fabric weight and stretch
- Garment dye vs piece dye
- Pocket and closure details
- Wash or finish
- Fit complexity (pleats, tapers)
- Size range
- Order size
Customisation
- Woven & printed labels
- Screen print · DTF
- Embroidery
- Garment dye & washes
- Hangtags & stickers
- Polybags & cartons
Compliance
- OEKO-TEX Standard 100Tested for harmful substancesAVAILABLE
- GOTSCertified organic cotton chainAVAILABLE
- BCI cottonBetter Cotton sourcingAVAILABLE
- WRAPSocial compliance, factory levelAVAILABLE
- amfori BSCISocial audit, factory levelAVAILABLE
Certificates belong to factories and mills, not to Giga Sourcing. Which scheme applies depends on the factory selected for your programme; live certificates are shared per programme after factory selection.
Process & timeline
- Brief & costing — Week 1
- Sampling — Weeks 2–4
- Fabric & trims — Weeks 5–7
- Production + QC — Weeks 7–12
- Shipping — Weeks 13–17
Typical first order. Fabric and trims booking overlaps the start of production; shipping time depends on the destination.
Trousers & chinos — FAQ
What is the minimum order quantity for trousers and chinos?
800 pieces per style per colour on stock fabric; 1,000+ for custom-dyed or custom-made fabric. Mills dye in lots of roughly 1,000 metres, which is why custom colours need higher quantities.
How much does a pair of chinos cost to make in Bangladesh?
We publish an indicative FOB band for trousers and chinos only once at least three written factory quotes support it. Until then the price guide shows the method and the main price drivers (fabric weight and stretch, garment dye vs piece dye and pocket and closure details), and your costing estimate is built line by line from factory quotes.
Why is the minimum 800 pieces for chinos?
Bottoms use more fabric per piece and more sewing operations than knit tops, so mills and lines set a higher floor. 800 pieces per colour applies to stock twill; custom-dyed fabric needs more.
Can you garment-dye chinos?
Yes. Garment dyeing gives a soft, lived-in colour and can be done in smaller lots than fabric dyeing; shade variation between pieces is part of the look and is agreed on a sample.
Do you handle labels and packaging?
Yes. Woven labels, hangtags, polybags and cartons are sourced and attached in the factory.
How do you check quality?
Inline checks during sewing and a third-party final inspection at AQL 2.5 before you pay the balance.
How long does sampling take?
Typically 10–14 days for a proto on stock fabric, plus courier time. Fit and PP samples follow in 1–2 week cycles.
Can I visit the factory?
Yes, in person or by video walk-through, arranged once your programme is confirmed.
- PRICING GUIDEPrice bands, method and worked example for trousers and chinos
- GUIDE · PRODUCT & FABRICProduct & fabric: choosing weights, compositions and finishes
- GUIDE · COST & DUTYWhat does it cost to make T-shirts in Bangladesh in 2026?
- TOOLLanded-cost calculator — FOB, freight and duty to your door
- MARKETSourcing apparel from Bangladesh to Germany
Start a trousers and chinos request
Step 1 is pre-filled with trousers and chinos. Reply within one business day.